dinsdag 25 december 2012

Torque arm

To provide a "brake out" of the hub motor, i've made two torque arms.
On top they will be fixed with a water hose clamp.


Gas throttle for crystalyte hub motor.

The original crystalyte thumb throttle won't fit, so i made a throttle of my own.
I can regulate the speed with a potentiometer and there is also a swith for the "cruise" function.


Transportbox part III

Now the small side panels are ready.
They are fixed with some alu strips through the frame holes.


zaterdag 15 december 2012

Transportbox part II

The basis for the transportbox is now finished.
I've integrated a small box for the Crystalyte controller as well.




zondag 2 december 2012

Bullitt transportbox

Now the woodworking part has started.
I use Poplar multiplex, very light weight in 12mm.
I want to make a bottom-, front- and rear panel and 2 sets of sidepanels.
One with an height of 30 cm , another with 60 cm, that also is variabel in width (max 70 cm).